About This Post
1 coat Java Gel Stain over 1 coat Amber Dye Stain, sealed with High Performace Topcoat, satin
Apply additional coats to acheive desired color.
When layering water-based and oil-based products, increase the dry time:
- Water over oil: Let oil-based products dry 72+hrs
- Oil over water: Let water-based products dry 24+hrs
Color Category:
Post Date
September 6, 2018