1 coat Java Gel Stain applied over 1 coat Yellow Dye Stain, sealed with High Performance Topcoat satin
Apply additional coats if darker color is desired.
When layering water-based and oil-based products, increase the dry time:
- Water over oil: Let oil-based products dry 72+hrs
- Oil over water: Let water-based products dry 24+hrs